Wilton Brewery
Challenge
Some challenges that we saw with this project was a very demanding and accelerated time frame. We had a crew covering and protecting pipes in the ceiling as well as working around a completed floor. Throughout the process there were multiple color changes and we had to make sure that we were extra careful to protect the brewing equipment and food processing.
Solution
Our crew was very meticulous when covering the brand new flooring and worked at a great pace to make sure that the work was completed on time even within the accelerated time frame.